Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

  Highways Department Logo Corridor Link Logo
   
         
 
 
 
  Illustration Pictures
CONTRACT PACKAGING
 
Package III – Entrusted Works in Wan Chai Development Phase II (WDII) Area
 
  • The works in this package have been entrusted to the Civil Engineering and Development Department (CEDD), including the tunnel structure in the WDII area and the civil works provisions for Electrical and Mechanical (E&M) / Traffic Control Surveillance System (TCSS) and drainage works.
  • WDII Website

 

  < Back







  Private Policy Site Map  
  All rights reserved. Highways Department